Master plan

Phase 1: 2013 to 2017

Pre-operation surveys. Dredging, resolution and construction of a modern cargo terminal with overall surface of 16 hectares and capacity of 3 million tons per year.

Phase 2: 2018 to 2020

Facilities surface and activity volume will be doubled.

EQUIPMENT


We offer world-class facilities with equipment such as:
- A 690 meters quay with 2 berths for Panamax type vessels.
- 2 mobile harbor cranes for loading and unloading containers.
- 4 RTG (Rubber Tired Gantry) cranes.
- 2 grain silos (wheat, malt.) with a capacity of 10,000 tons each. 2 extra 5000 tons silos will be added soon.
- 7 storage tanks for CPO (Crude Palm Oil) with an overall capacity of 10500 tons.

Assets:

  • Trucks 82
  • Trailers 247
  • Semi Trailers 200
  • Low beds 15
  • Car Carriers 02
  • Tanker Trailers 20
  • Forklifts 04
  • Loader 02
  • Dump Trucks 10
  • Reach Stakers 04
  • Empty Handlers 04